What does the camera compare it with?
I designed a camera system for every station in a sign plant. I never got to build it. What I wanted was simple enough to explain to anyone who had ever taken a sign apart. If a part was wrong, I wanted us to catch it while it was still on the bench.
Some jobs in our shop took hours. Others took months. Traditional poka-yoke and andon both assume the work repeats. Once you know how a part can go wrong, you can build a check into the work. An andon can call attention to the problem, but somebody still has to define what should trigger it. In a custom sign shop, the next order can be a sign nobody’s ever built. Yesterday’s trigger might have nothing to say about it. I wanted to use poka-yoke and andon on work that doesn’t repeat.
My design called for training the handoff check on photos of correctly built parts, along with examples of defects we’d collect over time. The word I’d underline now is “correctly.” Correct against what, on a sign we’ll build only once? And whose job is it to collect those photos while the sign’s moving through the shop?
A few good parts
That question came back to me in November, when A.I.Matics announced that its AIM-T1 inspection system for electronics had been named a CES 2027 Innovation Awards honoree. The vendor claim concerns what happens when the line changes over to a new product. A.I.Matics says the system uses reference samples of acceptable products to set the inspection criteria for a new product.
I kept coming back to the word “accepted.” By the time the camera sees a reference part, somebody’s already decided it’s good. On an electronics line, the next board of that design can come along and benefit from that decision. In a custom sign shop, the piece on the bench may be the only one on the order. By the time assembly confirms it fits, the chance to catch a mistake on that piece has passed.
What the light was supposed to show
At each station, the camera was meant to catch a mistake during the build. A light would point to the spot that needed attention while the part was still on the bench. At the handoff between modules, I wanted a separate quality check. That’s where the training photos came in.
Say you’re at the handoff and you have a photo of a panel that assembly accepted on the last order. You know that panel was right for that sign. To use the photo again, someone on the floor has to decide which detail carries over. If the drawing calls for a change in that very spot, the handoff check could flag a part they’d built correctly.
The defect photos have a different timing problem. A photo taken after assembly can show why a panel came back. What I’d want to know is whether you could’ve seen the same thing from the bench before the handoff. I’d ask the person in assembly who found it to look at the earlier view with the person who handed it over. If they can’t see it there, adding the assembly photo to the collection doesn’t give the camera at the bench a better view.
That’s time somebody has to spend on the order. Even a useful photo leaves work for the next shift if nobody can tell which job it came from or what made the part acceptable. I’d give the leadman responsibility for the reference at the handoff. The person doing the work should be able to pull up the photo and see which detail they’re being asked to check.
I’d frame the photo around the part. Only the people working that handoff and the leadman running the test would see the photos. They’d use them to check the part and diagnose the process. We’d never use the camera to rank the person at the bench. If anyone sorted the flags by name, I’d stop the test. A flag is a reason to look at a part. It tells you nothing by itself about the person who built it.
Where I’d start
I’d ask one leadman to own a test at one handoff into assembly. Before changing the work, I’d ask how assembly counts panels it finds wrong after handoff today. If there’s already a record, we’d use it. If there isn’t, the leadman and assembly would start a tally. Count each panel once and record how many panels went through that handoff. Otherwise a quiet week in assembly could look like an improvement.
The simpler fix is a hand check against the drawing for that order. I’d try it first. Have the person at the bench check the detail before releasing the panel, then let assembly tell us what still gets through. If the hand check catches the problem there and the next shift can do it from the same drawing, that’s enough. I’d keep the hand check.
For the comparison to mean anything, assembly would need to keep counting the same way once the camera check started. I’d keep a panel that assembly sent back in the tally even if the camera had passed it. That’s exactly the miss I’d want the team to be able to look at together.
I’d try a camera only if panels still get through and the missed detail is visible in a photo taken before handoff. I’d use the hand check as the comparison. Out of the panels that went through, did a smaller share reach assembly with that problem? I’d also count the good panels the handoff check held up and record the time the team spent preparing references. If the camera doesn’t reduce late finds, or if preparing the reference takes longer than doing the hand check and catches nothing extra, I’d end the trial.
Where on your floor does a mistake get found one station too late?
The floor tells the truth.
